Monte Carlo
Simulate thousands of possible price paths, work out the payoff on each, and average the discounted results. The answer comes with a standard error, so you always know how precise it is. American options use Longstaff-Schwartz regression to decide when early exercise beats holding on.
Contract
$
$
Simulation
$10.47
± 0.0085 standard error10.4496 to 10.4829
10.4506
Run statistics
| Paths | 100,000 |
| Standard error | 0.008490 |
| 95% CI low | 10.449605 |
| 95% CI high | 10.482884 |
| Control variate beta | 2.536934 |
| Variance reduction factor | 14.782753 |
| Seed | 42 |
| Compute time (price and Greeks) | 425 ms |
Greeks
Raw values are partial derivatives. The practitioner column rescales them to the units traders quote: per 1 volatility point, per 1% of rate, or per calendar day. Delta and Vega are pathwise estimates from the same simulation; the rest are bump-and-revalue with common random numbers, so Gamma and the second-order Greeks are noisy.
| Greek | Definition | Raw | Practitioner | Meaning |
|---|---|---|---|---|
| Delta Δ | ∂V/∂S |
0.63645 | 0.63645 per $1 of spot | How much the option price moves for a $1 move in the underlying. Also the number of shares needed to hedge one option. |
| Gamma Γ | ∂²V/∂S² |
0.018753 | 0.018753 per $1 of spot | How fast Delta changes as the underlying moves. High Gamma means the hedge must be rebalanced often. |
| Vega ν | ∂V/∂σ |
37.558 | 0.37558 per 1 vol point | Sensitivity to implied volatility. Long options gain value when volatility rises. |
| Theta Θ | ∂V/∂t |
-6.4208 | -0.017591 per calendar day | Time decay: how much value the option loses as one day passes with everything else unchanged. |
| Rho ρ | ∂V/∂r |
53.182 | 0.53182 per 1% of rate | Sensitivity to the risk-free rate. Calls gain and puts lose when rates rise. |
| Epsilon ε | ∂V/∂q |
-63.648 | -0.63648 per 1% of yield | Sensitivity to the dividend yield. Higher expected dividends lower the forward price, hurting calls and helping puts. |
Watch the simulation
The first 200 of the run's 100,000 paths draw one by one, then in bursts, each coloured by whether it ends in the money. Beside them the running estimate and its 95% band close in on the reference price as the paths add up. It is the run priced above, so it ends on the same estimate.
Sample paths
Thirty of the simulated price paths. The dashed line is the strike.
Distribution of the terminal price
Lognormal, as the model assumes: skewed with a long right tail.
Convergence
The running estimate as paths accumulate, with its 95% confidence band. The error shrinks with the square root of the path count: four times the paths halves the error.